This set of Total Quality Management Multiple Choice Questions & Answers (MCQs) focuses on “Lean Manufacturing Tools – Kanban, Five Lean Principles & Visual Factory”.
1. Which of the following means ‘visual cards’?
a) Poka-yoke
b) 5S
c) Muda
d) Kanban
View Answer
Explanation: Kanban means visual cards. It is a visual aid that triggers action. Kanban is utilized in lean manufacturing and just-in-time manufacturing.
2. C-Kanban is also known as _______
a) P- Kanban
b) Production Kanban
c) Withdrawal Kanban
d) Poka-Yoke
View Answer
Explanation: C-Kanban is also known as Withdrawal Kanban. ‘C’ stands for conveyance in C-Kanban.
3. Withdrawal Kanban is also known as Move Kanban.
a) True
b) False
View Answer
Explanation: Withdrawal Kanban is also known as Move Kanban. Conveyance Kanban, Withdrawal Kanban and Move Kanban all mean the same.
4. P-Kanban is also known as Production Kanban.
a) True
b) False
View Answer
Explanation: P-Kanban is also known as Production Kanban. P-Kanban and C-Kanban are the two main types of Kanban cards.
5. Calculate number of Kanbans if the hourly demand is 200 units, lead time is 12 hours, container capacity is 144 units, and variation in lead time is 15%.
a) 23
b) 22
c) 21
d) 20
View Answer
Explanation: Number of Kanban is given by the formula DT(1+x)/C. So, number of Kanban=((200*12)(1+0.15))/144=20.
6. _______ signals the need to produce more parts and ______ signals the need to deliver more parts to the next work center.
a) P-Kanban, C-Kanban
b) P-Kanban, P-Kanban
c) C-Kanban, C-Kanban
d) C-Kanban, P-Kanban
View Answer
Explanation: P-Kanban signals the need to produce more parts and C-Kanban signals the need to deliver more parts to the next work center. P-Kanban and C-Kanban are the two main types of Kanban cards.
7. Which of the following does not belong to the five principles of lean?
a) Identifying Value
b) Mapping the value stream
c) Creating flow
d) Establishing push
View Answer
Explanation: The five key principles of lean were given by Womack and Jones. They are identifying value, mapping the value stream, creating flow, establishing pull, and seeking perfection.
8. Which of the following is not an example of visual factory tools?
a) Visual indicators
b) Visual displays
c) Visual controls
d) Benchmarking
View Answer
Explanation: Visual indicators, visual displays, and visual controls are examples of visual factory tools. They simplify information and reduce time and resources.
9. Which of the following is not a benefit of a visual factory?
a) Safer workplace
b) Improved productivity
c) Lower profits
d) Improved output
View Answer
Explanation: Safer workplace, improved productivity, and improved output are benefits of a visual factory. In fact, there are higher profits due to more efficient processes.
Sanfoundry Global Education & Learning Series – Total Quality Management.
To practice all areas of Total Quality Management, here is complete set of 1000+ Multiple Choice Questions and Answers.
- Check Mechanical Engineering Books
- Check Total Quality Management Books
- Practice Aeronautical Engineering MCQs
- Practice Mechanical Engineering MCQs
- Apply for Aerospace Engineering Internship