This set of Railway Engineering Multiple Choice Questions & Answers (MCQs) focuses on “Railway Lines – Good Alignment Importance”.
1. What does alignment of a railway track mean?
a) Direction and position of the centerline of track in horizontal plane only
b) Direction and position @ 50mm distance on either side of centerline of track
c) Direction and position of the centerline of track in both horizontal and vertical planes
d) Direction and position of the centerline of track in vertical plane only
View Answer
Explanation: In railway terminology, “Alignment” means the direction and position of the centerline of the railway track with respect to both horizontal and vertical planes. A proper alignment of the track will ensure the safety and comfort of the passengers.
2. Which of the following is not an example of vertical alignment?
a) Level track
b) Gradient
c) Vertical curve
d) Gauge
View Answer
Explanation: The vertical alignment of a railway track refers to the direction and position it follows in the vertical plane. This includes gradient, level track and vertical curve. Whereas the horizontal alignment of a railway track refers to the direction and position it follows in the plan.
3. The alignment of a railway track can be changed very easily.
a) True
b) False
View Answer
Explanation: False. Once a railway track is constructed, it is very difficult to change its alignment. This is because of the difficulty in acquiring more land and reconstructing the already existing costly structures. Therefore, changing the alignment will take more time and prove costly.
4. How is accuracy of the rail alignment related to the operating speed of the train?
a) Inversely proportional
b) Directly proportional
c) No relation exists
d) Varies from place to place
View Answer
Explanation: More the accuracy of the rail alignment more will be the operating speed of the train. Improper alignment (either in horizontal plane or vertical plane) will reduce the speed of train and cause discomfort to the passengers.
5. The alignment survey of the Mumbai-Ahmedabad High Speed Corridor was done by which agency?
a) JICA
b) SNCF
c) Indian Railways
d) RITES
View Answer
Explanation: The Mumbai-Ahmedabad High Speed Corridor will be India’s first high speed rail line when completed. The project is scheduled to be completed by August, 2022. Japanese International Cooperation Agency (JICA) did the alignment survey and also researched about the technology to be used in the project.
6. Which of the following software cannot be used to design a railway track alignment?
a) Open Rail Designer
b) Trimble Quantm
c) Ferrovia
d) Primavera
View Answer
Explanation: Primavera software is used for project planning and management. It cannot be used for design of rail track alignment. The Delhi Metro Rail Cooperation used the Open Rail Designer software to modify and finalize the design of its Phase 4 expansion project. Using the software, the designing team completed the alignment design of railway line within 3 months.
Sanfoundry Global Education & Learning Series – Railway Engineering.
To practice all areas of Railway Engineering, here is complete set of 1000+ Multiple Choice Questions and Answers.
If you find a mistake in question / option / answer, kindly take a screenshot and email to [email protected]
- Check Civil Engineering Books
- Check Railway Engineering Books
- Apply for Civil Engineering Internship
- Practice Civil Engineering MCQs