This set of Petroleum Production Operations Multiple Choice Questions & Answers (MCQs) focuses on “Well Completion Design – Conventional Tubular Configurations”.
1. Single zone completion is also known as Conventional Tubular configuration?
a) True
b) False
View Answer
Explanation: Yes, Single zone completion is also known as Conventional Tubular configuration. Sometimes due to Governmental policies, high-pressure zones and corrosive fluids the Single zone completion is preferred.
2. Use of Packer may increase pressure on the casing when there exists a tubing leak.
a) True
b) False
View Answer
Explanation: Yes, Use of Packer may increase pressure on the casing when there exists tubing leak. When there exists a leak in the tubing then the pressure will obviously increase on the casing considering the other pressure sources, i.e. formation pressure.
3. In general, why are the Packers used?
a) To isolate the annulus from production
b) To isolate the pipe from production
c) Used in Group Gathering Station
d) It is used inside the separator unit
View Answer
Explanation: Packers are used to isolate the annulus from production. There are many types of packers, e.g Retrievable and Non-Retrievable type packers. The packers can be mechanically or hydraulically actuating.
4. What is the role of the Blast joint?
a) To isolate the annulus
b) To start the production
c) To save the production tubing from jetting action near perforation
d) To bypass the annular fluid to the production tubing
View Answer
Explanation: Blast joints are thick walled tubing which is used near the perforation to save the production tubing from jetting action of the formation fluid which might destroy the tubing near the perforation zone.
5. What does Well Completion mean?
a) It is the transformation of a well from drilling efforts to the production unit
b) It is the transformation of a well from production to drilling efforts
c) Drilling efforts
d) Work over efforts
View Answer
Explanation: Well Completion means the transformation of a well from drilling efforts to the production unit. The equipment used in well completion includes both surface and sub-surface equipment.
Sanfoundry Global Education & Learning Series – Petroleum Production Operations.
To practice all areas of Petroleum Production Operations, here is complete set of 1000+ Multiple Choice Questions and Answers.
If you find a mistake in question / option / answer, kindly take a screenshot and email to [email protected]
- Check Chemical Engineering Books
- Check Petroleum Production Operations Books
- Apply for Chemical Engineering Internship
- Practice Chemical Engineering MCQs